Rylee's Ace Hardware the Helpful Place

Three Locations to Serve You:

click to shop at Ace
click to check you Rewards Points
Share on facebook

Blog Catagories

Subscribe to Our Feed

Register to Comment on Our Blog

We love to hear from our customers. This form allows you to become a registered user of the Rylee's website. As a registered user, you will be able to see additional content on our website and make comments on our blog.



Blog Archive

Kick Breast Cancer To The Curb

Rylee's Ace Teams Up with the American Cancer Society To Fight Breast Cancer Click to Learn More

#000000

Ace's in the Kitchen

Ace's in the Kitchen is a cooking and learning program being offered exclusively at Rylee's Ace Hardware. Click to Learn More

#000000

Aura Paint Now at Rylee's

Get richer, more durable, and true color with Benjamin Moore Aura paint. Now Available to Rylee's. Click to Learn More

#000000

Make Your Garden Beautiful

We have everything you need to make your Flowers beautiful! Click to Learn More

#000000
http://www.ryleesace.com/components/com_gk2_photoslide/images/thumbm/111681P6040093.JPG
http://www.ryleesace.com/components/com_gk2_photoslide/images/thumbm/153731kitchen_banner_flat.png
http://www.ryleesace.com/components/com_gk2_photoslide/images/thumbm/521461painting2.jpg
http://www.ryleesace.com/components/com_gk2_photoslide/images/thumbm/631303greenhouse2.jpg
thumbnailthumbnailthumbnailthumbnail
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
PDF Print E-mail

The Building Continues....

Progress Made This Week 10/19/09 thru 10/23/09

The roofers continued making good progress on the roof. Plumbing for the roof drains were installed. Excavator adjusted the drain grates in the parking lot. Irrigation was installed. Dumpster pad was poured. Interior concrete floor was poured on the north half of the building. Roof top units were set on Tuesday. Consumers conduit was installed to the south of the parking lot.

Work to Begin Next Week 10/26 thru 10/30

Pour South half of the floor. Complete roofing. Start gas piping. Start interior steel stud framing. Pave parking lot. DTE to install gas line. Start overhead electrical rough in. Start overhead plumbing rough in.

Click here to see the full article from Start to Present Day.
 