Rylee's Ace Hardware the Helpful Place

Three Locations to Serve You:

click to shop at Ace
click to check you Rewards Points
Share on facebook

Blog Catagories

Subscribe to Our Feed

Register to Comment on Our Blog

We love to hear from our customers. This form allows you to become a registered user of the Rylee's website. As a registered user, you will be able to see additional content on our website and make comments on our blog.



Blog Archive

Kick Breast Cancer To The Curb

Rylee's Ace Teams Up with the American Cancer Society To Fight Breast Cancer Click to Learn More

#000000

Ace's in the Kitchen

Ace's in the Kitchen is a cooking and learning program being offered exclusively at Rylee's Ace Hardware. Click to Learn More

#000000

Aura Paint Now at Rylee's

Get richer, more durable, and true color with Benjamin Moore Aura paint. Now Available to Rylee's. Click to Learn More

#000000

Make Your Garden Beautiful

We have everything you need to make your Flowers beautiful! Click to Learn More

#000000
http://www.ryleesace.com/components/com_gk2_photoslide/images/thumbm/111681P6040093.JPG
http://www.ryleesace.com/components/com_gk2_photoslide/images/thumbm/153731kitchen_banner_flat.png
http://www.ryleesace.com/components/com_gk2_photoslide/images/thumbm/521461painting2.jpg
http://www.ryleesace.com/components/com_gk2_photoslide/images/thumbm/631303greenhouse2.jpg
thumbnailthumbnailthumbnailthumbnail
  • An Image Slideshow
  • An Image Slideshow
  • An Image Slideshow
PDF Print E-mail

The Building Continues....

Progress Made This Week 10/26/09 thru 10/30/09

Interior concrete is complete. Parking lot was final graded. Steel stud framing has started. Fire Protection piping has started. Propane pad and bump post were poured. Installation of the window frames has started. DTE installed the gas line to the building.

Work to Begin Next Week 11/2 thru 11/6

Continue with window frames and glass. Install door frames at the office area. Continue with fire protection lines. Pave parking lot (weather permitting). Start HVAC duct work. Continue with steel stud framing. Start overhead electrical rough in. Start overhead plumbing rough in.

Click here to see the full article from Start to Present Day.
 

Add your comment

Your name:
Title:
Comment: